Town-Wide Flood Vulnerability and Stormwater Planning
Two items would fund the Jupiter A1A beach front drainage project — a state grant of up to $100,000 and a $94,282 work order with Arkest, LLC — aimed at fixing drainage along the beachfront.
Legislative Impacts on Water Surcharges
Recent state legislative changes are phasing out water surcharge fees for outside-city residents, resulting in a $1.4 million revenue loss for the general fund. The town is conducting a rate study to address the shortfall.
2025 10-Year Water Supply Facilities Work Plan Update
The town is updating its comprehensive plan to adopt the 2025 water supply work plan, ensuring sufficient drinking water capacity and infrastructure through 2045.